What the first 30 days look like, by lane.

Onboarding walkthroughs · v1 · 2026

Each retainer has a different onboarding shape. Pick the lane you're evaluating to see the actual flow — Day 0 (Stripe checkout) through Day 30 (first executive PDF) — before you sign.

← Back to lanes overview

Why these exist

The most common pre-checkout question in our inbox is some version of "what actually happens after I pay?" Below is the literal answer for GEO, written out in full — the intake form’s real fields, and the Day-1 welcome quoted from the page that already publishes it. Audit Retainer and Cluster Ops are summarised below but not yet written out; we would rather say so than print three headings and call it a walkthrough. Buyers in serious evaluation mode usually want to see the flow once before committing — these pages exist for that read.

Each walkthrough mirrors the post-checkout reality. If something on the live page differs from what's described here, that's a documentation bug — reply to info@garnetgrid.com with the discrepancy and we'll reconcile.

Pick your lane

GEO · 30-DAY PREVIEW

GEO onboarding walkthrough

Citation polling, schema PR pack, llms.txt curation. From intake form (Day 1) to first executive PDF (Day 30).

WhenWhat happensWhat you do
Day 0Stripe checkout. The receipt is the record of the charge and arrives immediately.Nothing. Keep the receipt.
Day 1The intake form. Five fields, three to five minutes — your name, your organisation or context, which tier sounds closest, the nature of the confidential work, and the best way to reach you. Two of the five are required; the rest help and can be left blank.Fill it in. The work field is the one that shortens everything after it.
Day 2First citation poll runs against your buyer questions.Nothing. You get the first reading by email.
Day 7First weekly drop — what moved, what did not, and what we changed.Read it and push back on anything that looks wrong.
Day 30First executive summary covering the month.Nothing. It arrives at the address on the receipt.

What the Day-1 welcome actually says

Quoted from /account/geo/welcome/, which publishes it already — so this is the real artifact, not a sample written for this page:

The other two lanes follow the same shape — checkout, intake, first reading, weekly drop, monthly summary — but their walkthroughs are not written yet, and the sample monthly PDF this page used to promise does not exist. Both are named here rather than implied.

AUDIT RETAINER · 30-DAY PREVIEW

Audit Retainer onboarding walkthrough

Snapshot writer Worker, four-axis audit, weekly drift diff, engineering tickets in your tracker. From intake (Day 1) to first PDF (Day 30).

CLUSTER OPS · 30-DAY PREVIEW

Cluster Ops onboarding walkthrough

Monitor process deployment, traffic-tuned model placement, hot-swap protocol exercise, cost-per-token baseline. Intake to first PDF.

Common questions across lanes

How long does onboarding actually take?

The intake call is 30–60 minutes; the intake form is 3–5 minutes. From Stripe checkout to first deliverable: typically 24–48 hours for the first daily snapshot, 7 days for the first weekly drop, and 30 days for the first monthly executive PDF. The full retainer cadence is in steady-state by the start of month 2.

What if onboarding gets stuck?

Reply to your welcome email. The same engineer who handles delivery handles intake — no support ticket queue, no account-manager wall. SLA is <1 business day on Pro, <4 business hours on Scale, <2 hours on Enterprise.

Can we delay onboarding (e.g. waiting for legal sign-off on repo access)?

Yes. Subscriptions are month-to-month; the polling / snapshot / event-routing infrastructure runs from Day 1 regardless of when the customer-side prerequisites land. The first executive PDF auto-defers if a required input is missing.

What does cancellation look like?

Cancel any time via the Stripe customer portal (link in your dashboard footer). The last full report still ships at month-end. Workers and R2 buckets remain in your Cloudflare account; Garnet's read access is revoked. Your historical snapshots and PDF archive stay yours indefinitely.

Return to lanes overview →   or talk to engineering